The images below show some of the form work that was done under the lift shaft, These pictures were taken when I was breaking out the building side of the hole. We eventually dug it out to a depth of 450mm and inserted the steelwork as specified by the engineer. This was followed by concrete and a 200mm concreter nib around the base of the walls to provide flood protection to the inside of the building